Construction is in fool swing at the
School, the first phase for asbestos abetment has been completed. Mold abetment in the 1989 wing is done
and mercury abetment has been completed too.
We have a project sign now and so many
things are happening at the same time it is a very exciting time at
School! The weather has
collaborated with us and excavation and foundation work is happening now.
The storm drainage pipe through the
recreational field is done and a little more work is needed still, to make sure
grass grows properly. The
Oversight Committee has been coordinating with the Recreational field Board on
different scenarios for the upcoming fall season.
Inside the School they are working on the
Gym to have the first phase done as soon as possible; ceiling in hallways have
been taken out to allow for easy access for rewiring, adding ducts, etc. Our
staff at East Montpelier is working on getting school ready for kids, from
summer cleaning to coordinating with our Clerk of the works all of the little
details, plus making sure all the educational needs are taken care of too.
A lot of questions have been asked about
the tax Information here the note that was posted from the School Board on the blog on July 28th:
"Due to favorable financial market
conditions, the East Montpelier School Board secured permanent financing for
the school construction and renovation project that was approved by the voters
in November 2012. We were able to
lock in a rate lower than the rates projected at the time of the bond vote.
This will save taxpayers over $300,000 over the life of the loan. 2013-2014
property tax bills include the East Montpelier Elementary School Bond payment.
The tax rate includes a 16.4-cent increase for residential properties.
Nonresidential properties are not impacted by the cost of the project and do
not have a tax increase for this construction project.
Residential property owners whose combined
household income is less than $99,000 (or $106,000 if working) may be eligible
for a property tax adjustment. Vermont State Tax Forms H144 and H122 can still
be filed until October 15, 2013."
We are working in getting a table on the estimated anual tax increase associated with the project and some examples out as soon as possible.
We are working in getting a table on the estimated anual tax increase associated with the project and some examples out as soon as possible.
Thank you for your patience during the
renovation,
Oversight Committee